News Category
Archive
Newly Posted
-
How to ship service required scopes to Japan
Posted 07/12/2024
-
Congratulations to Gary Costello and Tom Reynolds for placing 1st and 2nd at Round 4 of the Great Britain National F Class League in Bisley (UK)!
Posted 07/03/2024
-
Congratulations for winning at the Polish Long Range Shooting Cup competition!
Posted 06/18/2024
Important notice) Extension of build time due to the delay of obtaining materials and parts
Posted 07/19/2022
As you may be aware, obtaining raw materials and supplies for manufacturing optical products, such as aluminum, lens materials, semiconductors, etc., caused by various factors in the global economy has become very difficult. There have been several delays in receiving parts, unfortunately resulting in longer manufacturing time.
At DEON (manufacturer of March Scopes), we are making every effort to ship as quickly as possible. However, it is difficult to shorten the build time as all March scopes are carefully hand assembled by skilled technicians with an emphasis on quality.
It will be some time before the supply of raw materials and parts returns to normal under the current global economic situation. We apologize for the inconvenience caused and we hope you understand that it will take a longer build time than usual for your order. Our current build time is about 2.5-3 months. We greatly thank you ahead for your understanding.